Carbon Capture Utilisation and Storage, Peak Cluster

Transformational project within the Peak District

Our role

  • We have been commissioned by the Breedon Group to assist them in preparing and submitting relevant planning / EIA documents in relation to a proposed carbon capture facility on land adjacent to their existing cement. 
  • The proposed facility forms part of a wider and much larger project - known as the Peak Cluster - for which a Development Consent Order will be sought. manufacturing facility in the Peak District.

Results

  • The Peak Cluster project comprises a number of carbon capture plants on other manufacturing sites within the Peak District, which are to be connected to a new pipeline (>100km length) through which the captured carbon will be transported and ultimately stored in secure sites beneath the Irish Sea.